SKU: 37773972668

Apc Netshelter Rack Pdu Advanced Switched 11 5Kw 3 Phase 415V 20A 520P6 42 Outlets

Sale price$1353.84 Regular price$1504.27
Save 10%

Pay in installments of $376.07 with ShopPay, AfterPay and Klarna

Shipping Estimate
USA
  • USA
  • CAN

Ships within 48 hours · Estimated delivery Aug 29 - Sep 3

Promo Codes Available:

For Your Every Summer RSVP, with Code: SUMMER15

Description

Apc Netshelter Rack Pdu Advanced Switched 11 5Kw 3 Phase 415V 20A 520P6 42 OutletsPower, protection, and precision for critical IT gear housed in APC NetShelter enclosures. The APC NetShelter 42 Outlets PDU is an Advanced Switched Power Distribution Unit designed for data center grade deployments, delivering reliable power to servers, storage, switches, and other rack mounted devices. With 42 individually controllable outlets, three phase 415V input, and an impressive 11. 5 kW capacity, this PDU scales with your growing data center

Power, protection, and precision for critical IT gear housed in APC NetShelter enclosures. The APC NetShelter 42-Outlets PDU is an Advanced Switched Power Distribution Unit designed for data-center-grade deployments, delivering reliable power to servers, storage, switches, and other rack-mounted devices. With 42 individually controllable outlets, three-phase 415V input, and an impressive 11.5 kW capacity, this PDU scales with your growing data center needs. Remote management, real-time metering, and a built-in local display give you complete visibility and control to boost uptime, optimize energy use, and streamline capacity planning. From compact IT closets to expanding data centers, the NetShelter 42-Outlets PDU is a cornerstone of modern rack power management, helping you accelerate maintenance, prevent overloads, and drive efficient operations.

  • Switched outlets for remote control: Each of the 42 outlets can be turned on or off remotely, enabling maintenance, reboot sequences, and energy management without physical access to the rack. This capability minimizes downtime and simplifies routine servicing in busy environments.
  • PDU-level power metering: Real-time visibility into voltage, current, power, and energy trends at the source of your IT gear. Use the data to optimize load distribution, forecast capacity, and prevent performance bottlenecks before they occur.
  • High-capacity three-phase power: Designed for dense deployments, this PDU operates on 3-phase 415V input with a 20A rating, delivering up to 11.5 kW of power to IT equipment while maintaining efficient, controlled power delivery inside your NetShelter enclosure.
  • Local display and smart protections: The built-in on-device display offers instant visibility into current power metrics and outlet status, while proactive overload awareness and alerts help protect critical devices and maintain uptime.
  • Seamless NetShelter integration: Engineered to fit cleanly inside APC NetShelter rack enclosures, providing a tidy, secure, and scalable power distribution solution for servers, storage, switches, and PDUs within a single, organized footprint.

Technical Details of APC NetShelter 42-Outlets PDU

  • Model/SKU: APC NetShelter 42-Outlets PDU, SKU 520P6
  • Outlet count: 42 outlets to support a broad range of rack-mounted devices and flexible power provisioning
  • Remote-outlet control: Switched outlets enable remote power cycling to troubleshoot, reboot, and manage devices without on-site intervention
  • Power metering: PDU-level monitoring delivers visibility into voltage, current, power, and energy trends for better capacity planning
  • Local display: Built-in display provides real-time power metrics and outlet status directly at the rack for quick checks
  • Overload prevention: Alerting and monitoring features help prevent overload scenarios and protect critical IT gear
  • Rack integration: Specifically designed for seamless installation inside APC NetShelter rack enclosures to maintain a tidy, secure rack ecosystem
  • Input and power rating: 3-phase 415V input, 20A, with an approximate 11.5 kW maximum load capacity

How to install APC NetShelter 42-Outlets PDU

  • Step 1: Verify compatibility with your APC NetShelter rack and enclosure dimensions to ensure a proper fit and secure mounting.
  • Step 2: Power down the rack area and prepare the rack by removing any existing equipment or plates that might interfere with mounting.
  • Step 3: Attach the PDU to the rack rails using the provided mounting brackets and secure with screws to ensure a solid, vibration-free installation.
  • Step 4: Connect the PDU input to your three-phase 415V power source, ensuring correct wiring and adherence to electrical codes and safety procedures.
  • Step 5: Route and organize cables to maximize airflow and accessibility, keeping power and data lines separate where possible to minimize interference.
  • Step 6: Power on the PDU and configure remote management settings, including outlet mapping, metering options, and alert thresholds for overload and fault conditions.
  • Step 7: Verify that all outlets respond to remote control, confirm real-time metrics on the local display, and test interworking with your monitoring system for end-to-end visibility.

Frequently asked questions

  • Q: Is this PDU compatible with APC NetShelter enclosures?
  • A: Yes. The 42-Outlets PDU is specifically designed for seamless installation inside APC NetShelter rack enclosures.
  • Q: How many outlets does the PDU have?
  • A: It provides 42 individually controlled outlets to support dense IT deployments.
  • Q: Does it support remote outlet control?
  • A: Yes. Outlets can be switched on or off remotely to facilitate maintenance, reboot sequences, and energy management without on-site access.
  • Q: What kind of metering does it offer?
  • A: The PDU offers real-time PDU-level power metering, including voltage, current, power, and energy trends to aid capacity planning and uptime optimization.
  • Q: What power rating does it support?
  • A: The unit is designed for 3-phase 415V input at 20A, with an approximate maximum load capacity of 11.5 kW.
  • Q: Is there a local display?
  • A: Yes. A built-in local display provides immediate visibility into power metrics and outlet status at the rack.
Shipping Notes
  • Free Standard Shipping on $100+ Orders to the USA.
  • Except Preorder products are shipped in 48 hours.
  • Delivery to the USA:
  1. Standard Shipping : 3-10 business days
  • If time is of the essence, please consider selecting expedited delivery for faster service.
Exchange/Return Notes
  • We offer a 30-day return/exchange service after receiving.
  • Final sale items are not eligible for returns or exchanges.
  • To process your return/exchange, please contact us at [email protected]
  • Please click here for more details>>> Return & Exchange Policy
SKU: 37773972668

Discover Niche Categories That Outsell

Top-Converting Item to Boost Your Average Order

4.5 ★★★★★
Based on 7 reviews
Sort
Highest Rating
Newest First
Oldest First
Product Reviews
M
Verified Purchase
Ma.Celestine Palma
Boise, US
★★★★★ 5
11th Gen Civic touring 1.5L Fits perfect
Impressive product, IT FITS MY 2024 HONDA CIVIC TOURING 1.5L! Value for the buck indeed! Will buy again in the future.
WAS THIS REVIEW HELPFUL?YesReportShare
Reviewed in the United States on September 28, 2025
M
Verified Purchase
Master do it yourselfer
Bozeman, US
★★★★★ 5
Looks like OE.
They looked identical to the OE filters I took out.
WAS THIS REVIEW HELPFUL?YesReportShare
Reviewed in the United States on August 21, 2025
D
Verified Purchase
Dorian
West Palm Beach, US
★★★★★ 1
Doesn't fit crv hybrid 2023
The engine filter doesn't fit my Honda crv hybrid 2023
WAS THIS REVIEW HELPFUL?YesReportShare
Reviewed in the United States on May 26, 2025
M
Verified Purchase
Maria
Cuba, US
★★★★★ 5
High Miles on Auto
Needed this O ring for my Honda. It works well and does what is expected. The rubber is flexible and not frayed or hardened. Easy to use and a decent price. So far there has been no issues with the o ring, no leaks, tears or damage.
WAS THIS REVIEW HELPFUL?YesReportShare
Reviewed in the United States on May 5, 2026
C
Chris
Chelsea, US
★★★★★ 5
Great replacement o-ring
I had to do some work on my Honda that required me to remove the steering pump. Any time you do that, you should replace the top o-ring. This o-ring was an exact match to the original and fit just fine. I popped it in and torqued it down to spec. It's holding a great seal and I've seen no problems with it. Good replacement in that it functions just like it should!
WAS THIS REVIEW HELPFUL?YesReportShare
Reviewed in the United States on June 23, 2025

recommand products