SKU: 31511155005

Eaton ATS rack PDU, 1U, Hardwired input, 5.76 kW max, 208-240V, 24A, None cord, Single-phase, Outlets: Hardwired

Sale price$546.51 Regular price$607.23
Save 10%

Pay in installments of $151.81 with ShopPay, AfterPay and Klarna

Shipping Estimate
USA
  • USA
  • CAN

Ships within 48 hours · Estimated delivery Aug 11 - Aug 16

Promo Codes Available:

For Your Every Summer RSVP, with Code: SUMMER15

Description

Eaton ATS rack PDU, 1U, Hardwired input, 5.76 kW max, 208-240V, 24A, None cord, Single-phase, Outlets: HardwiredThe Eaton ATS Rack PDU is engineered to deliver dependable, high density power distribution for data centers, server rooms, and network closets. This compact 1U unit is designed for hardwired input and hardwired output, with dual inputs that enable seamless automatic transfer switching between power sources. With a maximum capacity of 5. 76 kW and a 208 240V, 24A rating, this PDU provides the performance you need for critical IT equipment while

The Eaton ATS Rack PDU is engineered to deliver dependable, high-density power distribution for data centers, server rooms, and network closets. This compact 1U unit is designed for hardwired input and hardwired output, with dual inputs that enable seamless automatic transfer switching between power sources. With a maximum capacity of 5.76 kW and a 208-240V, 24A rating, this PDU provides the performance you need for critical IT equipment while helping to maintain uptime and power quality in demanding environments. The rugged, rack‑mountable design fits neatly into standard 19-inch racks, making installation straightforward and space-efficient without compromising serviceability or electrical safety.

  • Fast automatic transfer switching: Enjoy uninterrupted operation with a transfer time as fast as 10 milliseconds between power sources, so sensitive equipment experiences minimal disturbance during utility disturbances, generator switchover, or UPS transitions.
  • Dual input, single output configuration: Two independent input feeds connect to a single, hardwired output, enabling redundancy and flexible wiring options for robust power protection in constrained spaces.
  • 1U rack footprint with hardwired design: The slim 1U profile saves rack space while offering a secure, cord-free connection path for clean, reliable power distribution to attached equipment.
  • High-capacity power handling: Rated for up to 5.76 kW at 208-240V with a maximum current of 24A, supporting a wide range of servers, storage devices, and networking gear within modern data centers.
  • Durable, easy-to-service construction: Built for continuous operation in data-center environments, with straightforward access for installation, maintenance, and inspection, ensuring long-term power reliability.

Technical Details of Eaton ATS Rack PDU

  • Maximum power capacity: 5.76 kW
  • Nominal voltage: 208-240V
  • Current rating: 24A
  • Phase: Single-phase
  • Input configuration: Dual input through terminal block for hardwired power or flexible cord capability
  • Output configuration: Single hardwired output
  • Form factor: 1U rack-mountable
  • Corded/connectivity: None cord (hardwired input)
  • Outlets: Hardwired
  • Mounting: 19-inch rack, standard mounting hardware included

How to install Eaton ATS Rack PDU

Installing the Eaton ATS Rack PDU involves careful preparation, proper wiring, and adherence to electrical codes. Follow these general steps to ensure a safe and reliable deployment in your data-center or IT room. Always consult the official installation manual and local electrical requirements before proceeding.

Step 1: Plan the wiring layout. Determine the two independent power feeds you will use for the dual-input configuration and identify suitable circuit breakers, feeders, and grounding paths. Confirm voltage compatibility with your IT equipment and with the PDU’s 208-240V, 24A rating. Map out where the PDU will sit in the rack to align with cable routing, service access, and cooling airflow.

Step 2: Prepare the rack and hardware. Install the PDU into the 19-inch rack using the included mounting hardware. Ensure the mount is tight and level to prevent vibration or misalignment. Keep clearances for air intake and exhaust to avoid thermal issues. If your installation requires anti-tamper or environmental monitoring capabilities, ensure those provisions are planned in advance.

Step 3: Connect the dual inputs. Run two separate power feeders to the PDU’s input terminals, observing correct polarity and grounding. Use appropriate wire gauges for 24A at 208-240V as specified by the manufacturer and local electrical codes. Secure all connections with the terminal block and verify that the wiring is firmly tightened and insulated. If you are using flexible cords, route them neatly to minimize strain and interference with other cables.

Step 4: Connect the load. Attach the equipment loads to the PDU’s hardwired output paths according to your cabling plan. Ensure that load distribution across the two input sources remains within the PDU’s total capacity. Label circuits clearly and maintain separation between power and data cables to reduce electrical noise and potential interference.

Step 5: Configure transfer switching and safety checks. If the PDU includes transfer-switch capabilities or monitoring options, configure any required settings in accordance with the user manual and your facility’s contingency plan. Double-check that all safety features—such as proper grounding, overcurrent protection, and accessible shutoffs—are in place. Power up the system gradually, verify that the transfer switch engages correctly between sources, and confirm that the connected devices resume operation without interruption.

Step 6: Test and document. After wiring and configuration, perform a controlled test of the automatic transfer between sources to ensure the 10 ms transition time functions as intended. Monitor for any abnormal heat, vibration, or noise during operation. Document the installation, including wiring diagrams, circuit mappings, and monitoring addresses if applicable, so future service or upgrades can be performed smoothly.

Step 7: Commission and monitor. If monitoring or remote management features are available, enroll the PDU into your data-center infrastructure management (DCIM) system or UPS network, recording configuration details and establishing alert thresholds for overloads, input faults, or transfer events. Regularly inspect the unit as part of standard data-center maintenance to detect signs of wear, loose connections, or environmental variations that could impact performance.

Notes to installers: Always observe local electrical codes and safety practices. If you are unsure about dual-input wiring or high-power distribution, consult a licensed electrician or Eaton support representative. The PDU’s hardwired design expects careful, code-compliant termination at both input and output connections. Protect cables from crush, pinch, or exposure to heat sources, and ensure adequate airflow around the unit to maintain optimal performance and longevity.

Frequently asked questions

  • What is the Eaton ATS Rack PDU used for? It provides robust power distribution for critical IT equipment with automatic transfer switching between dual input sources, helping to safeguard loads from power interruptions and outages.
  • How quickly does the transfer between power sources occur? The PDU is designed for a fast transfer time of approximately 10 milliseconds, enabling near-seamless switchover for connected equipment.
  • Can I feed the PDU from two independent power sources? Yes. The dual-input configuration allows two separate power feeds to the PDU, delivering redundancy and improved availability for connected devices.
  • What voltage and current ratings does it support? The unit is rated for 208-240V operation at up to 24A, with a maximum power capacity of 5.76 kW, suitable for a range of servers, storage, and networking gear housed in a 1U rack.
  • Is there a corded option, or is it strictly hardwired? This model is described as having a none cord configuration, meaning it uses hardwired input connections rather than a removable power cord. The output remains hardwired as well.
  • What is the benefit of a 1U ATS PDU? The 1U form factor saves rack space while providing robust power protection and rapid source switching, helping maximize uptime in space-constrained data centers without sacrificing serviceability.
Shipping Notes
  • Free Standard Shipping on $100+ Orders to the USA.
  • Except Preorder products are shipped in 48 hours.
  • Delivery to the USA:
  1. Standard Shipping : 3-10 business days
  • If time is of the essence, please consider selecting expedited delivery for faster service.
Exchange/Return Notes
  • We offer a 30-day return/exchange service after receiving.
  • Final sale items are not eligible for returns or exchanges.
  • To process your return/exchange, please contact us at [email protected]
  • Please click here for more details>>> Return & Exchange Policy
SKU: 31511155005

Discover Niche Categories That Outsell

Top-Converting Item to Boost Your Average Order

4.3 ★★★★★
Based on 30 reviews
Sort
Highest Rating
Newest First
Oldest First
Product Reviews
G
Verified Purchase
G P
Carnegie, US
★★★★★ 1
Don’t buy
Size: 28'' X 34''
Mine arrived broken and scratched I think I received one that someone had returned. It also doesn’t hold pads that well my 4 lb teacup Yorkie is able to pull the pad off of the pad holder without even ripping the pad.
WAS THIS REVIEW HELPFUL?YesReportShare
Reviewed in the United States on March 26, 2026
Y
Verified Purchase
Yeny Cardero
Omaha, US
★★★★★ 5
Excellent!
Size: 22'' X 22''
Highly recommend this pad holder. Does an excellent job keeping the pad secure and in place. No more shredded pads since. Bonus: no leaks on the floor. It’s so practical and so helpful.
WAS THIS REVIEW HELPFUL?YesReportShare
Reviewed in the United States on March 1, 2026
R
Verified Purchase
RVRW
Dallas, US
★★★★★ 3
Pretty Good But Not Perfect!
Size: 28'' X 34''
I have been using two of these frames for my miniature poodle puppy for almost a month now and while they are useful, they could be improved. The size of the frames are great for our miniature size poodle puppy and the Amazon pads that fit the frames absorb well without leaking underneath. The grips on the bottom of the frame keep it in place so it does not slide across floor. The frame hinges in the center so you can easily carry it through doorways. I am in my 60's so it is nice to be able to carry it to my work table in order to change pads while standing up. My 4 month old 10 pound puppy can make a dinner plate size circle of pee onto the pad first thing in the morning. 4 large pees are easily held by the pee pads before needing to change it but we prefer to change the pads more often for sanitary reasons. Not sure if you have a very large breed dog that these would work for you. Our puppy likes going on these without hesitation so they are comfortable for him to walk around on and turn to find just the right spot! Compared to other brands I have looked at this is a great value for money and worth a try to help with potty training your pup. Our puppy sleeps in an X-pen inside of our home at night and when we are gone so these help with keeping the pads where we want them. We have two - one inside X-pen and one by door where we are training puppy to go outside. These frames are nice in appearance and seem like they will last but they are a little awkward to use compared to another brand I purchased which was more durable and easier to change pad. I ended up with these because other brands do not offer such a large size (28 x 34). Our main complaints about these frames are: 1. The top frame is hinged and a little wobbly to manuever over the edges of the pee pads. Another brand, while a bit smaller, has a solid one piece frame that goes over entire pad in one step. This frame requires a three step process of laying pad down, pulling edges out flat and placing one side of frame down and then repeating on other side. There is usually a bit of adjustment that needs to be done and so requires opening and closing the frame again for adjustments. 2. The Amazon pee pads that fit this frame hold the pee well without leaking but have very thin tissue paper like edges (blue) that do not extend out far enough to make capturing the edges of the pee pad under the frame very easy to maneuver. It would be a game changer if the pads were made at least 1" bigger around length and width so edges are firmly held in place. 3. Our tiny 10 pound poodle pup is able to easily dig out edges of pad and tear it up. Not as bad as a loose pad by any means, but blue edges are exposed at side centers where frame hinges and there is no cover of edges (unlike a one piece frame) and the blue color seems to attract him. He can dig and loosen pad on any side because there is no way to hide and hold down all of the blue edges of pee pad. I am still using these to potty train and, as I said earlier, these are way better than loose pee pads. I may shop for even larger size pee pads in the future to better lock down all of the edges without so much difficulty.
WAS THIS REVIEW HELPFUL?YesReportShare
Reviewed in the United States on May 5, 2026
J
Verified Purchase
Just a simple guy.
Draper, US
★★★★★ 4
Good product for dog training.
Size: 22'' X 22''
Work for the most part. Dogs will chew on it so wipe it down with dawn dish soap. Hard to clean where it clips down.
WAS THIS REVIEW HELPFUL?YesReportShare
Reviewed in the United States on March 13, 2026
F
Verified Purchase
Freedom
Houston, US
★★★★★ 5
Saving My Floors
Size: 28'' X 34'', Size: 28'' X 34''
Omg, what a game changer. My pups like to destroy the pads whenever they get the chance to. With this they still try but never succeed. I will say that it can be a little sturdier as the handles are a little flimsy, but I manage and it does the job. It's very easy to use when I change the pads and I use 2 pads for coverage. I just placed it where I usually place their pads and it fits right in the spot. They are trained to go outside but on rainy days this comes in handy. To save my floors it's definitely worth the money spent.
WAS THIS REVIEW HELPFUL?YesReportShare
Reviewed in the United States on April 26, 2026

recommand products