SKU: 3201009223

Implementing BIM Processes in Daily Construction Operations

Sale price$36.00 Regular price$40.00
Save 10%

Pay in installments of $10.00 with ShopPay, AfterPay and Klarna

Shipping Estimate
USA
  • USA
  • CAN

Ships within 48 hours · Estimated delivery Aug 29 - Sep 3

Promo Codes Available:

For Your Every Summer RSVP, with Code: SUMMER15

Description

Implementing BIM Processes in Daily Construction OperationsCOURSE OVERVIEW: Welcome to the Implementing BIM Processes in Daily Construction Operations course. This program is designed to provide you with the skills, tools, and applied knowledge necessary to integrate Building Information Modelling (BIM) into day to day construction activities across Australian building and infrastructure projects. BIM is more than a digital toolit is a collaborative process that enhances communication, accuracy, and

COURSE OVERVIEW:

Welcome to the Implementing BIM Processes in Daily Construction Operations course. This program is designed to provide you with the skills, tools, and applied knowledge necessary to integrate Building Information Modelling (BIM) into day-to-day construction activities across Australian building and infrastructure projects.

BIM is more than a digital tool—it is a collaborative process that enhances communication, accuracy, and coordination throughout the construction lifecycle. This course begins by clarifying the role of BIM as a workflow approach, rather than a singular software application, and explores its evolution within Australian construction delivery. Participants will gain insight into how BIM supports planning, coordination, and quality control across daily site operations, enabling teams to work more efficiently, safely, and with greater precision.

Successful BIM implementation depends on clearly defined responsibilities. This section explores the roles of BIM Managers, Coordinators, and site-based BIM users, and how they interface with engineers, site supervisors, and subcontractors. Participants will examine strategies for communicating model expectations and responsibilities to all trades to ensure consistency and accountability.

Compliance with national and international BIM standards is essential. This section outlines key frameworks such as the National BIM Guidelines and ISO 19650, and how to apply them within site operations. Participants will learn how to adhere to project naming conventions, file structures, and data-sharing protocols to ensure interoperability, auditability, and industry alignment.

The BIM Execution Plan (BEP) is central to structured implementation. This section guides participants through interpreting project-specific BEP requirements, understanding defined workflows and approval stages, and applying these protocols to daily site tasks. The focus is on using the BEP as a living document that drives consistent model usage and governance onsite.

BIM supports dynamic construction scheduling through 4D modelling. This section explores how to link model elements to time-based sequencing, visualise upcoming construction milestones, and communicate planned work using model animations to improve coordination across teams and trades.

Daily model use requires effective navigation skills. This section introduces practical tools such as Navisworks, Revizto, and BIM360, enabling workers to access federated models on mobile devices or site kiosks. Participants will gain confidence in locating model elements, viewing object data, and interpreting the model hierarchy in real time.

BIM-driven coordination identifies design clashes early. This section outlines how to conduct clash detection reviews, interpret coordination reports, and participate in resolution workflows. Participants will learn how to escalate unresolved conflicts and update models collaboratively to reflect accurate site conditions.

Drawing extraction remains essential for site execution. This section explains how to produce 2D shop drawings from BIM models, validate their consistency with current design intent, and use model mark-ups to raise clarification requests. The focus is on reducing rework by maintaining tight alignment between documentation and live models.

BIM enhances procurement and logistics. This section explores how model components can be tagged with order and delivery data, allowing for just-in-time scheduling and real-time tracking of materials. Participants will learn to use the model to monitor delivery status and manage inventory effectively onsite.

Survey and layout tasks benefit from BIM accuracy. This section demonstrates how to export coordinate points for robotic total stations or GPS units, and how to align physical set-out with model locations for walls, penetrations, and slab edges. BIM-driven layout significantly reduces manual entry errors and rework.

Integrating safety planning with BIM is a growing practice. This section examines how to embed scaffolds, exclusion zones, and cranage plans into the model, simulate site stages using 4D safety modelling, and review emergency plans directly within the digital environment.

Subcontractor engagement is crucial to BIM success. This section provides guidance on enabling subcontractors to interpret model views, share trade-specific model data, and manage access through controlled permissions. Participants will also explore how to encourage model literacy across all site contributors.

Model-based issue management streamlines RFIs and problem resolution. This section explains how to raise RFIs directly from BIM elements, tag issues within Common Data Environment (CDE) platforms, and track resolution workflows through structured issue logs that tie back to site tasks and program timelines.

BIM improves quality assurance and defect tracking. This section introduces methods for embedding QA checklists into model workflows, spatially locating defects for clear communication, and linking remedial actions to handover documentation to support project closeout requirements.

Progress reporting is enhanced by visualisation. This section explores how to mark completed works in the model, reflect as-built conditions through updates, and use this data to support subcontractor claims, client updates, and verification of construction milestones.

Cost management benefits from integrated 5D BIM practices. This section examines how to extract live quantity take-offs, monitor material usage, and track cost impacts using the model. Participants will also explore how BIM can integrate with project control software to support cost forecasting and variation tracking.

A Common Data Environment (CDE) ensures model integrity. This section outlines how to manage documentation, model versions, and RFI workflows within a shared platform. Participants will learn to maintain version control, audit trails, and secure access for all model interactions.

BIM continues beyond handover. This section introduces Asset Information Modelling (AIM) for facilities management, including how to attach operation manuals, maintenance data, and warranty records to model elements. Participants will learn how to prepare models for export into FM software to support long-term asset lifecycle management.

By the end of this course, you will be equipped with the applied knowledge and tools to implement BIM processes effectively within daily construction operations—enhancing coordination, safety, quality, and accountability across all stages of on-site delivery.

Each section is complemented with examples to illustrate the concepts and techniques discussed.

LEARNING OUTCOMES:

By the end of this course, you will be able to understand the following topics:

1. Introduction to Building Information Modelling (BIM) in Construction Operations

  • Understanding BIM as a process, not just software
  • The evolution of BIM in construction delivery
  • Importance of BIM for daily coordination, planning, and quality

2. BIM Roles and Responsibilities on Site

  • Overview of roles: BIM Manager, BIM Coordinator, site-based BIM user
  • Interfacing BIM with site supervisors, engineers, and subcontractors
  • Communicating expectations to all trades using BIM

3. BIM Standards and Guidelines in Australia

  • Understanding the National BIM Guidelines and ISO 19650
  • Aligning with state infrastructure BIM requirements
  • Complying with naming conventions, file structures, and model protocols

4. BIM Execution Plan (BEP) and Project Protocols

  • Reviewing the BIM Execution Plan (BEP) for project-specific requirements
  • Roles, workflows, and approval processes in the BEP
  • Using the BEP to guide daily on-site BIM tasks

5. Integrating BIM into Construction Schedules

  • Linking BIM models to 4D construction sequencing
  • Using BIM to visualise upcoming works and milestones
  • Communicating planned works through model animations

6. Model Navigation and Viewing for Site Teams

  • Using model viewers
  • Understanding object properties, IDs, and model hierarchy
  • Accessing model data on tablets, kiosks, and mobile devices

7. Visual Coordination and Clash Detection

  • Identifying and resolving clashes between trades
  • Reviewing clash reports and conducting coordination meetings
  • Implementing site-level resolution workflows for detected clashes

8. Shop Drawing and Model-Based Documentation

  • Extracting 2D drawings from federated models
  • Ensuring alignment between shop drawings and latest models
  • Using model mark-ups for site clarification requests

9. Linking BIM to Procurement and Material Tracking

  • Tagging model elements with ordering and delivery data
  • Using the model for quantity take-off and procurement scheduling
  • Monitoring deliveries and locations through model-linked databases

10. Field Layout and Surveying with BIM

  • Exporting model points for use in robotic total stations or GPS units
  • Setting out walls, slabs, and penetrations using coordinated model data
  • Reducing manual entry errors through BIM-driven layouts

11. Integrating BIM with WHS and Site Safety Planning

  • Embedding exclusion zones, scaffolds, and crane plans into the model
  • Visualising safety staging through 4D simulations
  • Reviewing high-risk areas and emergency plans in the model environment

12. Subcontractor Engagement and BIM Enablement

  • Educating subcontractors on how to read and use models
  • Sharing simplified or trade-specific BIM views
  • Managing model access and version control for external partners

13. Request for Information (RFI) and Issue Management

  • Creating RFIs directly from model elements
  • Tagging issues and assigning actions within CDE platforms
  • Tracking and resolving queries through BIM issue logs

14. Quality Assurance and Defect Tracking via BIM

  • Embedding inspection checklists and QA forms into BIM workflows
  • Recording defects and resolutions spatially in the model
  • Linking QA data to handover documentation

15. Progress Tracking and Model Updates

  • Tagging completed works in the model for visual progress reports
  • Updating models to reflect as-built changes
  • Using progress data for subcontractor claims and client reporting

16. BIM for Cost Control and Quantity Management

  • Using 5D BIM for live quantity take-offs and cost tracking
  • Monitoring material usage and waste through the model
  • Integrating BIM data with cost estimating and project control tools

17. Common Data Environment (CDE) Usage Onsite

  • Accessing shared models, documents, and RFIs through a CDE
  • Managing model updates, approvals, and revision control
  • Ensuring version integrity and audit trail for all model interactions

18. Handover and Asset Information Modelling (AIM)

  • Preparing the model for facility management and client handover
  • Linking O&M manuals, serial numbers, and warranties to model elements
  • Exporting data for use in FM software platforms

COURSE DURATION:

The typical duration of this course is approximately 2-3 hours to complete. Your enrolment is Valid for 12 Months. Start anytime and study at your own pace.

ASSESSMENT:

A simple 10-question true or false quiz with Unlimited Submission Attempts.

CERTIFICATION:

Upon course completion, you will receive a customised digital “Certificate of Completion”.

Shipping Notes
  • Free Standard Shipping on $100+ Orders to the USA.
  • Except Preorder products are shipped in 48 hours.
  • Delivery to the USA:
  1. Standard Shipping : 3-10 business days
  • If time is of the essence, please consider selecting expedited delivery for faster service.
Exchange/Return Notes
  • We offer a 30-day return/exchange service after receiving.
  • Final sale items are not eligible for returns or exchanges.
  • To process your return/exchange, please contact us at [email protected]
  • Please click here for more details>>> Return & Exchange Policy
SKU: 3201009223

Discover Niche Categories That Outsell

Top-Converting Item to Boost Your Average Order

4.0 ★★★★★
Based on 17 reviews
Sort
Highest Rating
Newest First
Oldest First
Product Reviews
D
Verified Purchase
Debbie
Fort Morgan, US
★★★★★ 5
Great dog balls at a great price
Size: Medium
The balls are a favorite for my dog. I could have done without the hole through the middle because I don't do treats in balls anyway. My dog loves balls for their own merit. I needed replacement balls for my Nerf Dog Ball launcher. It seems the originals have disappeared from the market. I took a chance because the price is right and this Chuck-it ball works very well so we're liking this ball a lot. So far my Dachsund, who can destroy a tennis ball (the kind they are selling as Nerf Dog replacements) in 3 minutes has not done any damage to this one so that's a win. I recommend this as a much better ball than the fuzzy tennis balls. I like the colors too since many dog toys are green (which gets lost in the lawn, etc.) or red (even though dogs have red/green color blindness. Blue and orange are good and pretty easy to find. I liked these well enough that this set was my second purchase so I will have spares in case the others are lost.
WAS THIS REVIEW HELPFUL?YesReportShare
Reviewed in the United States on May 21, 2023
J
Verified Purchase
Just passing through
Fort Morgan, US
★★★★★ 5
My Baby loves his new baby!
Size: Medium, Size: Medium
Finally! A ball my 107 lb. pitty/pointer mix can’t destroy. He has torn up every single “indestructible” toy in a day or so until now. He peels fabric and fur off non-rubber toys. He is a 4-legged shredder. I’ve added pictures of him for a size reference of my dog versus this product. I know I had wanted that when shopping for this item. This ball is now his beloved “baby.” He goes absolutely insane looking for it, chewing it, chasing it, and even sleeping with it. He won’t rest unless he knows exactly where it is. It is his only toy, and he is good with that. After getting this home, I tried giving him other choices, but he won’t touch them. I was worried that he would rip it apart by putting his teeth in the holes, but so far, not a scratch. It is soft enough to collapse just enough to keep it from cracking when his jaws crush it but not so soft that he can rip it to sheds. The holes are large enough to prevent a suction or vacuum effect on his tongue or mouth. For his size jaws, it is a perfect fit. Other dogs might have problems with suction or be able to get their teeth in those holes and rip it apart. Who knows? The older version of the Chuckit squeaky ball was his favorite for the year and a half he had it, but the way they make them now, he peels off the orange triangle in hours flat, the squeaker falls out (choking hazard), and then he rips it apart. I’m going to stock up on these. I can’t imagine how crazy he will be if they ever stop production or change the materials.
WAS THIS REVIEW HELPFUL?YesReportShare
Reviewed in the United States on May 9, 2019
M
Verified Purchase
Mitch
Phoenix, US
★★★★★ 5
Our German Sheppard loves these
Size: Medium
These cost a bit more than tennis balls, but they are so much nicer and longer lasting. For starters, they stay cleaner than tennis balls because they’re smooth rubber. Dirt won’t build up on them and if anything does stick, like grass or soil, it falls off once the dog slobber dries. They’re also thick, so they don’t fall apart or blow out like a normal tennis ball does in our dog’s jaws after 30 seconds. Our GS chomps on these like crazy and the only damage they’ve suffered is a crack that developed from the edge of the hole, but the crack is growing very slowly and none of these balls have totally failed yet. The balls do whistle when thrown ant high speed and that may help a dog track and locate it, but I’m not sure. Our neighbors hear the whistling too so it’s far from silent. Lastly the orange ball is easy to locate out in our yard, but the dark blue practically disappears.
WAS THIS REVIEW HELPFUL?YesReportShare
Reviewed in the United States on April 6, 2025
C
Verified Purchase
Casey B
Alexandria, US
★★★★★ 5
Great for smaller dogs
Size: Small
These two balls are perfect for the smaller mouthed dog that loves to play fetch. These balls are not only super durable (lots of teeth biting), but float in the baby pool we use for our miniature dachshunds. The value here is much better than you’d find anywhere else. The noise, if bitten hard enough, was “low” at best. Easy to spot/find if overthrown. Will definitely buy again once these are in bad repair; so far, so good-love these for my fur babies!
WAS THIS REVIEW HELPFUL?YesReportShare
Reviewed in the United States on October 8, 2024
E
Verified Purchase
E. Schall
Belleville, US
★★★★★ 5
My dogs favorite balls
Size: Medium
These are great for my dog who always has to have a ball in her mouth. Not too hard so I don't have to worry about her teeth. They last for ever. They do lose their shape a little over time (like I said, she always has a ball in her mouth) they become a little oval in shape. They still bounce, she still chases it and she still chews on it so I don't think she notices or cares. I've gotten her a bag full of these over time and I have only seen one that she chewed a chunk out.
WAS THIS REVIEW HELPFUL?YesReportShare
Reviewed in the United States on September 28, 2023

recommand products